Rocksdale Bridge - 9/29/2021

Image
Getting started with setting the beams. Rip rap has been installed around the end bents. 3rd beam of the day going on. Almost half way through. Last one on this end of the bridge. Guys getting it lined up correctly. Moved on to the other half to repeat the process. View from the side. Coming together well. Beams are installed.

Rocksdale Bridge - 9/23/2021

Image
View from bent 1. Forms & rebar set and ready for concrete. View of bent 2. Bent 3 pour complete. Smoothing out the surface. View from bent 3. Pouring concrete for bent 1. Pour complete. Smoothing out bent 1.

Rocksdale Bridge - 9/20/2021

Image
Crew working on getting the rebar and forms set. Pouring the bent 2 wall today. View from bent 3. Getting the pour underway for bent 2 wall. Wrapping up the pour. 3 trucks.

Rocksdale Bridge - 9/15/2021

Image
Work pads have been poured for both end bents. Getting measurements for cut offs. Cutting the piling.

Rocksdale Bridge - 9/14/2021

Image
Crew getting the hammer set up. Piling is in the ground waiting. Getting started on the first one of the day. On to the 2nd of the day. 1st one will need another section welded on. Continuing to work on the intermediate bent piling. Moved over to end bent 1. 3 men working on tying rebar. Getting close to finishing end bent 1 piling. Moved over to end bent 3. Finishing last one on end bent 3.

Rocksdale Bridge - 9/11/2021

Image
Pre-boring for the intermediate bent. Bent 3 piling in place. Need hammered. Once finished pre-boring we’ll get the piling in for the intermediate bent.

Rocksdale Bridge - 9/9/2021

Image
Job board up. View from the west. View from the east. Piling in place and waiting to be drove. Remaining piling sitting off to the side. Crew is going to pre bore today. Getting ready.

4041 Site visit (Bent 3 Pre-bore)

Image
  Contractor was onsite to Pre-bore Bent 3 Piling onsite match Material Certs Contractor placed Piling in holes and filled, will seed them on Wednesday We hit water during Pre-Bore about 5 feet down